Friday, 1 November 2013

Friday, 18 October 2013

WEEK 11 - Assignment 2 - Concept Design

Assignment 2 - Concept Design

Based on the brief last week, I come up the concept design. I'm still going through the tutorials of Revit but right now I can't use it very well, and there is a problem of instillation. (Revit require 50Gb and none of my drives have enough space! ;( I am now trying to install Revit into my portable hard drive). So I developed the design by drawing as well as using the Sketch Up.

Lower Ground Level


 Ground Level


First Level

Friday, 11 October 2013

WEEK 10 - Assignment 2 - Brief

Assignment 2 - Brief


Rooming list:

Master Bedroom   (En-suite and walk in rope with panorama view)
Bed Room            (For Ana Maria Niemeyer with private bathroom)
Guest Room         (For relatives and guests)
Study Room         (Including library, for drawing and designing)
Bathroom            (Associated with the guest room and study room)
Living Room         (Family Area, where family can have fun together)
Dining Room        (Close to the living room)
Kitchen                (Next to the dining room, with double wall oven)
Laundry               (Sufficient to do washing, ironing, etc inside the room)
Garage                (For 2 cars with additional storage space and tool table)
Balcony               (Large Balcony for family connected with the living room)
Balcony               (Small balcony off of the master bedroom)




Relationships

Master bedroom and Ana's bed room should be grouped together, although the guest bedroom and study room should be associated with the public areas of the house rather than the other bedrooms. Nevertheless, ensure that this room is also able to maintain some degree of privacy when in use by guests.

The walk in robe should be used as a buffer between the bedroom and ensuite. Can also be used as an entrance into bedroom suite, but then must have doors on robes to make it look better.

Living room to be the hub of the house.

Garage to have internal access from house.

Maximum 2 storeys allowed.




Features

The major line of the house need to be curved and build with reinforced concrete.

The house need to be transparent in family area such as living room and dining room with big windows and skylights, we need lots and lots natural light. 

Nature is not separate or artificial, but it is free and is suggested in all places of shelter.

Ana wants a warm atmosphere of familiarity.

We want a house that is warm in winter and cool in summer, and inexpensive to run.

king size bed in the master bedroom.

Living room should be big enough for visitors to hang out in when entertaining



Concept Design







Thursday, 10 October 2013

WEEK 10 - Assignment 2 - DA Submission


Assignment 2 - DA Submission


Site Description

The site for this assignment is a parallelogram approximately a 49m long and 15.9m wide in a low density residential area located on 5 Wyargine Street, Mosman,Sydney. Area of the site is 713m2 and the floor Space ratio is 0.5:1 which means the useable space is 357m2. The maximum height of the house is 8.5m and most of the neighbors are one to two stories residential houses. The site is near Balmoral Beach, about 120 meters walking distance, as well as the public transport, which is100 meters away.





Site Analysis-General Information

Location: 5 Wyargine Street Mosman
Area: 713m2
Dimension: 49X15.9m
Zoning Type: R2- low density residential (Mosman LEP 2012 HOB)
Maximum Height: 8.5m (Mosman LEP 2012 HOB)
Storey Allowed: 3 (DCP pg. 25 p.1B) 
Floor space ratio: 0.5 (FSR map Mosman LEP)
Land size: 350m2 
Maximum Wall Height: 7.2m (DCP pg.27 item, P8B)
Major side for views: East
Sun orientation: North side
Weather: Sea breeze from the East; Hot winds from the West; Rain and storm from the South (South West)



Setback and Topography

From street: Appropriate to neighbors (DCP pg.27 item, P8B)
Neighbors: One storey: 900mm;Two storey: 1.5m (DCP pg.27 item, P8B)
From any sewage and other structures that need to be excavated – 2m (DCP pg.27 item, P7B)

1. The building should be sited with regard to topographical features minimizing cut and fill and should be sited to preserve existing significant trees, rock formations and other significant vegetation. (DCP pg.30 obj.9)
2. Existing established trees which contribute to the amenity of the area and trees listed on council urban forest management register are to be retained and incorporated into the building design (DCP p.29 obj.P2)
3. Where an existing tree are approved for removal adequate space in the landscape design is to be provided from a re-placement tree(s) (DCP pg.39 obj.3)
4. When trees are planted as part of development they should not unreasonably obstruct views from neighbouring properties or public views. (DCP pg.39 obj.7)
5. Our site is part of the proposed habitat link which require wildlife friendly garden (DCP pg.42)
6. The landscape design needs to allow visual surveillance of the street. (DCP pg.43)
7. Minimum soil depths for planting on slabs for: (DCP pg.43 obj.11) 
(A). For ground cover and small shrubs 500mm in height is 400mm depth of soil
(B). For medium shrubs up to 1,5m the depth minimum is 650mm.
(C). For tall shrubs and small trees up to 5m the depth is 750mm.

Friday, 13 September 2013

WEEK 7 - Studio Exercise 4 - Brief

Studio Exercise 4 - Brief


Part 1

Oscar Niemeyer was a  brilliant, energetic, ruthless Brazilian architect who lived 104 years. "He was the master of the curve, the architect who could command tonnes of concrete and steel to swoop and turn with a few strokes of his pencil ", Rowan wrote. 

His family home Das Canoas House, Designed by Niemeyer in 1951, was built to on the slope of a hill overlooking the bay, and suggests panoramic images of the same. 

For the concept of this house, Niemeyer said of the matter: "My concern was to project the residence freely and to adapt it to the unevenness of the field without modification, making it into curves, so the vegetation could enter them without separation or departure from the straight line."

"And I created the living spaces to be in a shadow, to avoid the need for curtains and allow the house to be transparent, as I preferred."

The windows of the rooms are characterized by the outgoing profile and look at the subtropical vegetation, the wonderful nature of the area that stands out is the most in the eyes of the observer that conditions for the entire process of project. Nature is not separate or artificial, but it is free and is suggested in all places of shelter, such as in the broad granite outgoing entering the room from the garden, almost emerging from the soil.


Part 2
After research, I made the brief by using PS:

1-Introduction





2-Plan and Elevation





3-Space





4-Nature






5-Material

Reference:
1. http://en.wikiarquitectura.com/index.php/Das_Canoas_House
2. http://designkultur.wordpress.com/2010/06/27/review-books-on-architecture-%C2%ABoscar-niemeyer-houses%C2%BB-text-by-alan-hess-photos-by-alan-weintraub/
3. http://en.wikipedia.org/wiki/Oscar_Niemeyer
4. http://www.theguardian.com/artanddesign/gallery/2012/dec/06/oscar-niemeyer-life-architecture-pictures




Saturday, 7 September 2013

WEEK 6 - Assignment 1 - Final Submission

Assignment 1 - Final Submission



Weekly Progress:

Animation




Student Crit
Thank you very much Sally!













Friday, 6 September 2013

WEEK 6 - Assignment 1 - Presentation

Concept Design







Progress























Sections

Ground Level



First Level


Second Level