Thursday, 10 October 2013

WEEK 10 - Assignment 2 - DA Submission


Assignment 2 - DA Submission


Site Description

The site for this assignment is a parallelogram approximately a 49m long and 15.9m wide in a low density residential area located on 5 Wyargine Street, Mosman,Sydney. Area of the site is 713m2 and the floor Space ratio is 0.5:1 which means the useable space is 357m2. The maximum height of the house is 8.5m and most of the neighbors are one to two stories residential houses. The site is near Balmoral Beach, about 120 meters walking distance, as well as the public transport, which is100 meters away.





Site Analysis-General Information

Location: 5 Wyargine Street Mosman
Area: 713m2
Dimension: 49X15.9m
Zoning Type: R2- low density residential (Mosman LEP 2012 HOB)
Maximum Height: 8.5m (Mosman LEP 2012 HOB)
Storey Allowed: 3 (DCP pg. 25 p.1B) 
Floor space ratio: 0.5 (FSR map Mosman LEP)
Land size: 350m2 
Maximum Wall Height: 7.2m (DCP pg.27 item, P8B)
Major side for views: East
Sun orientation: North side
Weather: Sea breeze from the East; Hot winds from the West; Rain and storm from the South (South West)



Setback and Topography

From street: Appropriate to neighbors (DCP pg.27 item, P8B)
Neighbors: One storey: 900mm;Two storey: 1.5m (DCP pg.27 item, P8B)
From any sewage and other structures that need to be excavated – 2m (DCP pg.27 item, P7B)

1. The building should be sited with regard to topographical features minimizing cut and fill and should be sited to preserve existing significant trees, rock formations and other significant vegetation. (DCP pg.30 obj.9)
2. Existing established trees which contribute to the amenity of the area and trees listed on council urban forest management register are to be retained and incorporated into the building design (DCP p.29 obj.P2)
3. Where an existing tree are approved for removal adequate space in the landscape design is to be provided from a re-placement tree(s) (DCP pg.39 obj.3)
4. When trees are planted as part of development they should not unreasonably obstruct views from neighbouring properties or public views. (DCP pg.39 obj.7)
5. Our site is part of the proposed habitat link which require wildlife friendly garden (DCP pg.42)
6. The landscape design needs to allow visual surveillance of the street. (DCP pg.43)
7. Minimum soil depths for planting on slabs for: (DCP pg.43 obj.11) 
(A). For ground cover and small shrubs 500mm in height is 400mm depth of soil
(B). For medium shrubs up to 1,5m the depth minimum is 650mm.
(C). For tall shrubs and small trees up to 5m the depth is 750mm.

Friday, 13 September 2013

WEEK 7 - Studio Exercise 4 - Brief

Studio Exercise 4 - Brief


Part 1

Oscar Niemeyer was a  brilliant, energetic, ruthless Brazilian architect who lived 104 years. "He was the master of the curve, the architect who could command tonnes of concrete and steel to swoop and turn with a few strokes of his pencil ", Rowan wrote. 

His family home Das Canoas House, Designed by Niemeyer in 1951, was built to on the slope of a hill overlooking the bay, and suggests panoramic images of the same. 

For the concept of this house, Niemeyer said of the matter: "My concern was to project the residence freely and to adapt it to the unevenness of the field without modification, making it into curves, so the vegetation could enter them without separation or departure from the straight line."

"And I created the living spaces to be in a shadow, to avoid the need for curtains and allow the house to be transparent, as I preferred."

The windows of the rooms are characterized by the outgoing profile and look at the subtropical vegetation, the wonderful nature of the area that stands out is the most in the eyes of the observer that conditions for the entire process of project. Nature is not separate or artificial, but it is free and is suggested in all places of shelter, such as in the broad granite outgoing entering the room from the garden, almost emerging from the soil.


Part 2
After research, I made the brief by using PS:

1-Introduction





2-Plan and Elevation





3-Space





4-Nature






5-Material

Reference:
1. http://en.wikiarquitectura.com/index.php/Das_Canoas_House
2. http://designkultur.wordpress.com/2010/06/27/review-books-on-architecture-%C2%ABoscar-niemeyer-houses%C2%BB-text-by-alan-hess-photos-by-alan-weintraub/
3. http://en.wikipedia.org/wiki/Oscar_Niemeyer
4. http://www.theguardian.com/artanddesign/gallery/2012/dec/06/oscar-niemeyer-life-architecture-pictures




Saturday, 7 September 2013

WEEK 6 - Assignment 1 - Final Submission

Assignment 1 - Final Submission



Weekly Progress:

Animation




Student Crit
Thank you very much Sally!













Friday, 6 September 2013

WEEK 6 - Assignment 1 - Presentation

Concept Design







Progress























Sections

Ground Level



First Level


Second Level








Friday, 30 August 2013

WEEK 5 - Studio Exercise 3 - Poster boards

Studio Exercise 5 - Poster boards

Poster from other students
By looking other students' work, I found these two posters that I like. It's very simple and clear, especially the second poster form Maggie Liu, the shape of the lines are matched with the content, makes the poster neat and tidy.


Saurce: arch1390-2012-wai-shun-chu.blogspot.com.au/

Saurce: http://mwsl-arch1390.blogspot.com.au/



My Posters
These are my work during the studio time. In the first poster I want to convey the idea 'plastic', in order to achieve this, every picture are warped by a Chinese ink style ring. However, it isn't look good. The diagram looks a bit messy.



Poster 1

For the second poster, I want to deliver the spacing and path of the building. Similar color were used in order to match with diagrams.  I also want the graph looks clean and clear. In my opinion, this poster looks better than the former one.


Poster 2


Thursday, 29 August 2013

Friday, 23 August 2013

WEEK 4 - Studio Exercise 3 - Research Exercise 2

Studio Exercise 4 - Research Exercise 2
The NiterĂ³i Contemporary Art Museum

Exterior


Interior


Interior


Section - Base Level


Section - Middle Level


Section - upper Level


Red(Pink)- Primary Path
Blue- Secondary Path
Yellow- Tertiary Path